MANUFACT.INS
Sign in

Delivery & Service · ManufactINS

Finished Goods

Finished stock through inspection, approval, packing and reservation.

What changed in Finished Goods recently

  1. New · Release 2.31 · 19 November 2026

    MRP, Inventory and Finished Goods now forecast each material’s use and each product’s shipments from the plant’s own monthly history. Holt-Winters is used only where it beats the same month last year on months it was not fitted on; otherwise last year’s figure is used, and the screen says so. MRP’s 30-day need, run-out date, reorder point and order-up-to at 95% service follow the forecast; Inventory and Finished Goods show months of cover and the stock beyond six months of forecast use. Sample plants run it on labelled sample history.

  2. Fixed · Release 1.77 · 13 November 2026

    Order, lot, batch and NCR numbers stay whole in tables on tablets and desktops too: in a crowded column “SO-WT-2611” broke after each hyphen onto three lines on the Master Plan, Production Orders, Traceability and Finished Goods. Every screen was checked at 375, 768 and 1440 pixels wide, in English and Arabic.

  3. Fixed · Release 1.58 · 5 November 2026

    On phones, a long record number in a table’s pinned first column — a lot, an order, a batch — ran over the column beside it (the lot numbers over the product names on Finished Goods). It now wraps inside its own column, on every table, in English and Arabic. Every screen was checked at 360, 375 and 768 pixels wide, in both languages, for text that overlaps and for pages that scroll sideways.

  4. Improved · Release 1.33 · 25 October 2026

    Working Capital, Inventory, Demand, Procurement, CAPA, Scheduling, Capacity, NCR, Profitability, Products, Production Orders, Finished Goods, MRP, Traceability and Cost are built from each plant’s own records — balances are the sums of their invoices and lots, never a sample scaled to the plant. Other modules say plainly whose records they show.

Every release