Master Plan

The master production schedule balancing demand, capacity, material and priority.

What changed in Master Plan recently

  1. New · Release 2.22 · 17 November 2026

    Cairo Automotive Components’ CNC cell — the plant’s capacity constraint — has its own sample operators: a day and an evening operator on each crewed machine, signing in like the Elsewedy sample operators, with today’s Engine Mount and Brake Housing work on My Day, Live Operations and the Master Plan. The sample reset recreates them; no password is in the code.

  2. Improved · Release 2.21 · 17 November 2026

    One state for an order on every screen: an order in production is running, next or queued in today’s sequence; one on material hold or in final inspection is released but held off the machines; a planned order is not released yet. Sales Orders, Production Orders, Scheduling, the Master Plan and the Shop Floor now agree, and the Shop Floor’s made-to-date is the figure Scheduling plans the rest from.

  3. Improved · Release 2.21 · 17 November 2026

    Master Plan: one lateness — orders forecast after their committed date on the order book — on the headline, the plant table and the plant’s own figures; an order not released says so instead of “On Track”; a crew is shown only where Workforce records the people a line needs; and a machine the floor marks idle is not given work.

  4. Improved · Release 2.21 · 17 November 2026

    One process per plant: the Overview’s stages name the phase each runs in, the Master Plan names the product’s own step on each phase, and Fabrication says which of the eight stages run in which phase; a pharma plant shows its oral-liquids route beside solids, and sheet-metal stamping and automotive plants show their own routes.

  5. Fixed · Release 2.21 · 17 November 2026

    Live Operations lists only current alerts, and its plan says lines finish their work within the shift; Master Plan names the flagship’s two shifts on each machine from its sample roster, and Workforce shows where its 486 people work beside the 18 machines.

  6. Fixed · Release 2.21 · 17 November 2026

    Arabic: plant names, locations and line names in the page headers and on Live Operations; the Master Plan’s order states use the order book’s names; Capacity says how many of its work centres are producing; the waiting-for column follows each order’s recorded reason; OTIF tiles say their cohort is illustrative.