Production · ManufactINS
Today’s Work
Each operator’s jobs, clock and progress for today — operators work their own; managers and supervisors see the whole team, what is not in order, and each person’s screen.
What changed in Today’s Work recently
New · Release 2.56 · 20 November 2026
Each operator’s page, and a manager opening it in Today’s Work, shows what they are doing now, every step this shift and their progress against plan. An operator can send a note to their supervisor and line lead from there, even with no signal.
Improved · Release 1.95 · 14 November 2026
Live Operations, Today’s Work and the fabrication screens show the menu’s breadcrumb; the Riyadh plant’s sales orders read in riyals when it is the only plant in scope; a chart’s table with nothing in it says so.
Fixed · Release 1.91 · 14 November 2026
A shift that starts before midnight and ends after it stays on the date it started — My Day, Today’s Work, the Android app, clock-in and clock-out, the photo checks and the Shift attendance report treat it as one shift, and its hours go to the date it began. Day shifts are unchanged.
Improved · Release 1.64 · 8 November 2026
Today’s Work for managers opens with the team at a glance in one card — plan progress, jobs done, who is clocked in, who is behind plan or on track, planned against shift time — instead of seven separate tiles.
Fixed · Release 1.57 · 3 November 2026
On an uploaded order’s failure watch, each asset’s “a day down costs” is the late-delivery penalty of the deliveries its own queued critical work ships in, not the whole critical path’s figure; work waiting on a hold shows “On hold — waiting for …” instead of “Running now”; and Today’s Work spells out worked time against plan (“44m behind plan”).
New · Release 1.57 · 3 November 2026
Raise NCR: shift supervisors, QA, production and plant managers raise a non-conformance on screen — product or material, line, machine, operation, quantity, severity, proposed disposition, supplier or heat, and a photo — from the quality screen, Today’s Work, Live Operations and an order’s quality view; a double click raises one NCR.
Pages that cover Today’s Work
- MES software for the shop floor — and the decisions above itThe MES core most plants start with — jobs, clock-in, downtime, NCRs, order routes — alongside a full MES where one runs.
- Factory management software for one plant or severalOne view of production, people, machines, quality and decisions, plant by plant or across plants.
- Machine downtime tracking software, from the stop to the causeStops reported from the floor, worked by maintenance, ranked by reason, with MTBF and MTTR from your work orders.
- Manufacturing software in Egypt, built around how Egyptian plants workEGP with Egyptian VAT and withholding, the Egyptian calendar and Ramadan, and Egyptian Arabic, spoken and handwritten.
- Manufacturing software in Saudi Arabia, alongside your ERPRiyadh time and weekend, riyal pricing with live or fixed FX, Arabic throughout, alongside your ERP.
More in Production
- Production OrdersOrders through release, setup, run and completion, against BOM and routing.
- Fabrication OrdersEight-stage heavy-steel fabrication — an uploaded order’s own work orders through its route, stage by stage from its production plan and shift reports, with its inspections and NCRs; the demonstration plants show the shop-floor tablet board.
- Live OperationsReal-time operator productivity, order progress, completion rates, delays, bottlenecks and KPIs by location.
- Shop FloorLive floor — lines, machines, output, scrap and downtime as they happen.
- OEEAvailability, performance and quality by machine, line, shift and product, with loss drill-down.
- Digital TwinThe factory as a live model — lines, machines and flow, coloured by status and risk.
- Factory LayoutAI drafts the plant floor layout from a short description — lines, stations and how they connect — draws it, and overlays live decisions: the bottleneck, a stopped machine and the re-route around it.