MANUFACT.INS
Sign in

Strategy & Investment · ManufactINS

Predictions

Demand, failure, quality, lead-time and cost forecasts, each with its drivers and how it is measured.

What changed in Predictions recently

  1. New · Release 2.16 · 17 November 2026

    Every decision and recommendation says what happened that triggered it, why to act and what happens if nothing is done, and what it will change — and, once carried out, what it changed so far. “Why this action? Ask the AI” explains it whole, on decisions, the full record, fabrication gates, plant recommendations and the simulation on Predictions.

  2. New · Release 2.08 · 15 November 2026

    What-if studio: the flask button in the top bar, or “Try a what-if on this figure” in any ƒ panel, opens a sandbox on a plant. You can change selling prices, demand, material prices, USD/EGP, the electricity tariff, wages, people, added shifts, machines down, extra scrap, a late material or the CBE rate. The platform’s own model recomputes every figure the change reaches, across Overview, OEE, Quality, Capacity, Profitability, Cost, Energy, Sales Orders, MRP, Procurement, the Decision Center, the best decisions package and Predictions. Each is shown before → after, with a loading state and the changed figures highlighted. Nothing is recorded.

  3. Improved · Release 2.07 · 15 November 2026

    Predictions, decisions, the package and what the assistant reads recompute whenever the data changes. That covers a machine stop, scrap, a late purchase order, pieces made against an order, the CBE rate finance sets (above copper’s monthly rise, the copper lock gives way to buying to plan), a material price and the dollar. Take the change away and every figure returns to where it was. New tests and 13 Egyptian-factory questions in the assistant’s checks hold this.

  4. Improved · Release 1.89 · 13 November 2026

    Menu order follows the work: in Strategy & Investment, Market Intelligence → Predictions → Scenario Simulation → Feasibility Studies; in Sales & Orders, Order Mail sits beside Sales Orders. No address, favourite or permission changed.

  5. Fixed · Release 1.74 · 10 November 2026

    The flagship’s sales orders take their forecast from the finite-capacity schedule, so Sales Orders, Ask, Predictions and the sequencing decision give the same date — SO-10432 is forecast 14 Nov, 8 days late. The sequencing decision quotes the scheduler before and after: SO-10411 five days sooner, SO-10428 and SO-10432 a day later, total lateness 23 → 20 days but the latest order 8 → 9 days, changeover +40 minutes.

  6. Fixed · Release 1.74 · 10 November 2026

    The three Elsewedy heavy-steel plants show one factory on every screen: BOM, Warehouses, MRP, Suppliers, Quotations, Contracts, Predictions, the Digital twin and Simulations now read the plant model — the materials share, plate on hand and plate flow, the bottleneck (Capacity Planning’s constraint line), the plate price trend and the suppliers’ scorecards. A reconciliation check fails if a heavy screen and a modelled screen drift apart.

Every release