MANUFACT.INS
Sign in

Procurement & Materials · ManufactINS

Suppliers

Supplier 360 — price, quality, delivery, risk score and the alternates when one slips.

What changed in Suppliers recently

  1. Fixed · Release 2.06 · 15 November 2026

    A second pass fixed more figures at their source: first-pass yield is weighted by value (products are counted in different units — 95.6% for all plants, not 97.3%); MRP and Procurement count only stock that can be issued (34 materials short within 30 days, not 27); raw stock is aged receipt by receipt; Cash Planning rolls an entered balance forward from its date; recorded stops count against planned shift time only; fabrication progress is weighted by each stage’s planned hours; Order Feasibility prices materials at the product’s standard cost; budget forecasts never count open orders twice; and a Riyadh-only view reads in riyals on Suppliers and Raw materials.

  2. Fixed · Release 1.74 · 10 November 2026

    The three Elsewedy heavy-steel plants show one factory on every screen: BOM, Warehouses, MRP, Suppliers, Quotations, Contracts, Predictions, the Digital twin and Simulations now read the plant model — the materials share, plate on hand and plate flow, the bottleneck (Capacity Planning’s constraint line), the plate price trend and the suppliers’ scorecards. A reconciliation check fails if a heavy screen and a modelled screen drift apart.

  3. Improved · Release 1.38 · 27 October 2026

    The Document Reader reads and places a document in one step and shows the result as a review: what the document is (its type is now read from it — choose one only if it gets it wrong) and what it is for, which order or plant it belongs to and the references that put it there, what it says, every field it will fill with its value now and after, the screens it updates (Procurement, Suppliers, Inventory, Decision Center…) and the waiting decisions it answers. When it is right, “Confirm and file” is the only step; when it is not, correct the text or a field and check again, or place it on another project.

  4. Improved · Release 1.26 · 23 October 2026

    Every module shows an uploaded order’s own data instead of “No live records”: Master plan, Scheduling and Capacity its plan, replan and operator plans; Sales orders and Contracts its PO and changes; Cost, Margin and Working capital its cost and invoices; Procurement, Suppliers and Inventory its materials; Shop floor and Live Operations its production reports and plans; Quality, NCR and Traceability its inspections; Delivery and Dispatch its dispatch list. Portfolio figures for the order (progress, forecast, lateness, health, headcount, risks) come from the uploads, and the sample header figures are hidden for it.

  5. Fixed · Release 1.26 · 23 October 2026

    Inventory, Suppliers, Master plan, Shop floor, OEE, Machines, Quality, Sales orders, Delivery, Predictions and Predictive maintenance no longer show the demonstration plants’ sample figures relabelled for an imported order — they show its own data, or say what to upload.

  6. Improved · Release 1.21 · 23 October 2026

    Every KPI row leads with its most important figure at display size, in every design theme — OEE on the OEE screen, on-time delivery on Suppliers — with the supporting measures beside it and no empty cells.

Every release