Procurement & Materials · ManufactINS
Warehouses
Receiving, putaway, picking and dispatch, with barcode / QR-ready movements.
What changed in Warehouses recently
New · Release 2.26 · 19 November 2026
Warehouses → Safety stock across the network: where to hold it — at each distribution centre or pooled at the warehouse — for each node’s service target, within storage, shelf life and the transfer days customers accept; every placement is compared, so the answer is the proven best. ManufactINS holds no distribution-centre records and ChainINS has no stock model yet, so the centres are entered or taken from the labelled example.
Improved · Release 2.21 · 17 November 2026
Screens that hold one plant’s reference sample — Warehouses, Energy, Workforce, BOM, Routings, Dispatch, Sustainability and After-sales — no longer show it under another plant: they say the plant has no such records yet and show the figures the platform does hold for it, the Saudi industrial tariff for Riyadh among them.
Fixed · Release 1.74 · 10 November 2026
The three Elsewedy heavy-steel plants show one factory on every screen: BOM, Warehouses, MRP, Suppliers, Quotations, Contracts, Predictions, the Digital twin and Simulations now read the plant model — the materials share, plate on hand and plate flow, the bottleneck (Capacity Planning’s constraint line), the plate price trend and the suppliers’ scorecards. A reconciliation check fails if a heavy screen and a modelled screen drift apart.
Fixed · Release 1.57 · 3 November 2026
An uploaded order’s labour hours and port holds read right: when the production reports cover the period, man-hours are the reported hours and the labour cost is turned into hours at the loaded rate it was booked at (cost ÷ reported hours), not at the roster’s pay — which overstated the hours by about two thirds on an order booked at EGP 100 an hour loaded against EGP 61 of pay; and Warehouses counts a purchase-order line as held at the port only when its own import status says so — not a line still at sea whose status mentions the duty due at clearance, not a line still at the forge matched to a note about other flanges, and not a line matched to a risk that only mentions “imported” content (“port” now has to be a word of its own, also when naming the cause of a stoppage).
New · Release 1.0 · 27 September 2026
Planning & supply: Demand, Master Plan, Capacity, MRP and Scheduling, plus Procurement, Suppliers, Inventory and Warehouses — shortages and bottlenecks flagged before they bite.
More in Procurement & Materials
- ProcurementRequisitions to POs, supplier quotes, price history and buy-now / wait recommendations.
- SuppliersSupplier 360 — price, quality, delivery, risk score and the alternates when one slips.
- InventoryStock by site, status and batch, with turns, excess, dead stock and safety-stock health.